  • WQJWJ Integrated Rainwater and Sewage Intercepting Well
  • WQJWJ Integrated Rainwater and Sewage Intercepting Well

WQJWJ Integrated Rainwater and Sewage Intercepting Well

Intelligent integrated rainwater and sewage interception well, dedicated to rainwater and sewage diversion, intelligently diverts rainwater and sewage into their respective pipelines through real-time monitoring of data, and achieves functions such as sunny interception, initial rain interception and enhanced discharge, and direct discharge during rainy season in stages. The intelligent integrated rainwater and sewage interception well can independently judge and execute the opening and closing of valves at different rainfall stages according to the size of the water volume, effectively treating non-point source pollution at the end, and tailoring according to customer requirements, precise prefabrication.

The intelligent integrated rainwater and sewage interception well integrates the cylinder body, submersible sewage pump, grille, drainage gate, interception gate, water pump, and liquid level gauge, and is customized according to actual usage. It ensures product reliability while achieving intelligent interception.

WQJWJ Integrated Rainwater and Sewage Intercepting Well

■Customized design, strong adaptability
■Quality assurance, safety and reliability
■Convenient installation and compact construction period
■Intelligent diversion, saving trouble and worry

1.Cylinder body

Using fiberglass reinforced plastic (GRP) material and computer-controlled spiral winding process. The overall design life is 50 years based on CFD flow field analysis and CAE strength calculation.

Equipped with inlet and outlet pipes, rubber flexible joints, and top maintenance covers. Auxiliary equipment such as safety grilles, ventilation ducts, and fans.

The application of CFD and CAE, in collaboration with the National Water Pump and System Engineering Technology Research Center and Jiangsu University, has been analyzed through CFD flow field analysis to ensure the optimal flow state and solve adverse water conservancy phenomena.

Based on the on-site environment of each interception well and combined with soil conditions, conduct mechanical analysis to ensure the strength of the cylinder body.

2.Submersible sewage pump

Full head non overload, non clogged impeller;

Adopting geometrically symmetric non overload efficiency impeller; The hydraulic design adopts CFD technology to achieve the best match between the pump body and impeller, with the widest flow channel, the best sewage throughput, and the highest efficiency.

Independently developed submersible motors;

The submersible motor with H-class insulation operates at a temperature of 180 ℃, providing the best cooling effect, prolonging its service life, and reducing water level during operation.

High configuration standard parts;

All standard parts are made from internationally renowned brands, and world-class suppliers work together with Kaiquan to create them.

Kaiquan became the first domestic trademark for SKF bearings

Equipped with multiple protections such as oil chamber, motor and wiring chamber water inlet, winding temperature rise, water pump vibration, etc., and can also be matched with bearing temperature rise protection according to customer requirements.

The supporting submersible electric pumps have all obtained national energy-saving certification products.

3. Internal configuration

Drainage gate

Adopting the type of downward opening barrier door, the main material is stainless steel, with rubber soft seal, which has the characteristics of light weight, flexible operation, corrosion resistance, and convenient installation and maintenance.

Equipped with an electric head or hydraulic cylinder, it can prevent both river surges and sewage overflow. At the same time, it can adjust the flow rate and adjust the opening of the barrier door according to the values of the internal and external liquid level gauges, stopping at any height position.

Water inlet grille

Made of stainless steel 304 material, equipped according to different inlet pipes. Basket type and guide rod coupling installation, simple and convenient. The grid gap is 20-50mm, which can be used to store debris in the basket for regular cleaning in the future.

Electric gate valve

The long handle gate valve is made of 304 stainless steel material and sealed with nitrile rubber. It is driven by a dual-purpose electric head on the top cover of the cylinder. During the initial rainfall, the sewage flow can be limited. Adjustable interception multiple, actively shut down when the water level in the sewage pipe network is high, combined with strong discharge from the sewage pump.

4. Electric control cabinet

The combination of intelligent control cabinet and remote monitoring platform

The perfect combination of integrated rainwater and sewage interception wells and remote monitoring systems

Equipped with an advanced independently developed monitoring and remote management system – Kaiquan Smart Cloud, data is uploaded to the platform to achieve joint control of multiple interception wells and multi-point rain gauges, improving the efficiency of sewage interception and drainage work. At the same time, based on the dynamic water level and collected rainfall data, the gate can be automatically opened and closed, and the water pump can be started and stopped. It can be automatically controlled on sunny and rainy days, achieving unmanned operation.

 

Judgment Execute the command
Run status Bottom of sewage pipe<discharge water level<strong discharge water level<bottom of rainwater pipe<initial rainfall interception water level<direct discharge water level on rainy days Discharge gate valve (gravity flow) Drainage rising barrier gate
(Gravity flow)
Submersible sewage pump
(Forced discharge)
Clear day pollution interception 1. The water level inside the cylinder is less than the discharge water level Open Close Close
1. Discharge water level<cylinder water level<strong discharge water level Close Close Open
Pre emptying before rain 1. Rainfall meter measures rainfall information:
2. The bottom of the sewage pipe<the water level inside the cylinder<the strong discharge water level
Close Close Open
Initial rain interception and pollution control 1. Rainfall meter measures rainfall information:
2. Initial rain interception water level<cylinder water level<direct discharge water level on rainy days
Close Partial Open
(Anti backflow)
Open
Direct drainage on rainy days 1. Rainfall meter measures rainfall information:
2. On rainy days, the direct discharge water level is less than the water level inside the cylinder:
Close Open Close

Application field

Comparison between traditional sewage interception wells and intelligent integrated interception wells
The construction period is long and cannot be immediately put into use Short construction cycle, saving time
The geological conditions are complex, and excavation is easily restricted Factory prefabrication and integrated production
Large footprint and limited land use Small footprint, saving 50% of land
High cost of cofferdam Low engineering cost, saving 30% of costs
Low level of automation and high long-term labor costs Remote monitoring, unmanned, low operating costs
Low interception efficiency High interception efficiency, and good results in the later stage
Retrofit solutions

Solution for rainwater and sewage interception and renovation in residential areas

A sewage interception and renovation project in a residential area in Shanghai

Pump station specifications: DN2000 * 3730/DN2000 * 3400/DN2000 * 2450

Solution for urban sewage interception and renovation

Guangdong pollution interception and renovation project

Pump station specification: DN3800 * 7300

A comprehensive service system
  • Pre sales
  1. Accurately grasp customer needs and tailor solutions accordingly
  2. Accept customer phone inquiries
  • On sale
  1. On site guidance for installation
  2. Explain the key points and precautions for operation
  • After sales
  1. On site debugging
  2. Timely resolution of malfunctions

Scope of Supply
Name Internal components Configuration Remarks
Cylinder body system Pump Station Simplified GRP Continuous mechanical winding, computer-controlled
Manhole cover Embossed aluminum plate
Safety grille GRP grating+SS304 Humanized design to prevent accidental well falls
Ventilation duct SS304
Climbing ladder 38304
Liquid level protection sleeve SS304
Water pump suspension chain hook SS304
Grille suspension chain hook 5S304
Safety grille hooks SS304
Simplified hanging ear Q235
Micro resistance switch
Water inlet system Basket Grille SUS304
Guide rails and lifting chains SUS304
Grille bracket SU5304
Water inlet pipe GRP Size and elevation match with on-site pipelines
Inflow pipe connection Rubber+SS304 flange
Strong exclusion system Submersible pump Submersible pump Chopper pump as the main pump
Coupling base Cast iron
Guide rails and lifting chains SUS304
Pressure pipeline SUS304
Check valve Cast iron+epoxy coating
Gate valve Cast iron+epoxy coating
Forced exhaust pipe SS304 Size and elevation match with on-site pipelines
Forced discharge pipe bending connection Rubber+SS304 flange
Sewage system Sewage gate Optional knife gate valve or float limiting valve
Sewage pipe SS304 Size and elevation match with on-site pipelines
Connection of sewage pipes Rubber+5S304 flange
Rainwater drainage system Lower opening barrier gate
Rainwater drainage pipe GRP Size and elevation match with on-site pipelines
Rainwater drainage pipe connection Rubber+SS304 flange
Control system (optional water quality monitoring instrument) Liquid level gauge protective sleeve SUS304 Configure floating ball and pressure sensor
Rain meter Optional configuration
Outdoor intelligent control cabinet SUS304 Outdoor rainproof type
Remote monitoring Remote control, human-machine dialogue, mobile terminal monitoring, etc
Other Accessory Axial flow fan Air volume according to pump station specifications Standard configuration
Plasma deodorization Optional configuration
Sulfide oxygen gas monitoring In-Line Optional configuration below 2 meters
Small cantilever crane Optional configuration